You are here

Turin Railway LinkTurin Railway LinkTurin Railway LinkTurin Railway Link
Project Highlights
Sector railways and subways
Country Italy
Location Torino
Progress completed
Construction from 2000; to: 2006
Description

The works mainly involved quadruplication and laying below ground level of the existing Turin-Milan railway line and have been performed in an urban context parallel to the current line.

Two cut-and-cover tunnels have been built side by side, one to be used for the existing line (slow line) and one for the new fast line.

The project presented a number of specific executive and organisational characteristics given the urban context the works are performed in and the immediate vicinity of the Turin-Milan railway line which is in operation.